Andhra Pradesh PCB directs all industries and establishments operating DG sets of capacity 125 kVA and above to retrofit Emission Control Devices/Equipment in DG sets by 5.03.2021

The Andhra Pradesh Pollution Control Board (“Board”) has issued Orders pertaining to retrofitting of Emission Control Devices / Equipment in DG sets with a capacity of 125 kVA and above in the State.

This is being done as Ministry of Environment, Forest and Climate Change (“MoEFC”) has launched the National Clean Air Programme for the prevention, control and abetment of air pollution level in the country at an urban and regional level. The Government of India has recognized significant sources of air pollution such as vehicles, DG sets, construction dust etc. and therefore a plan has been put in place for the national level target of 30% reduction of PM2.5 and PM10.

In view of the same, the Board exercising its powers under the Air (Prevention and Control of Pollution) Act, 1981 and the Environment (Protection) Act 1986 has directed all industries and establishments operating DG sets of capacity 125 kVA and above, within the jurisdiction of the state of Andhra Pradesh to –

• Retrofit all operational DG sets of capacity 125 kVA and above with an Emission Control Device / Equipment having a minimum specified Particulate Matter capturing efficiency of atleast 70% tested as per 5 mode D2 cycle. The Emission Control Device / Equipment must be tested over a ISO-8178 5 mode D2 cycle for equivalent kVA rating by one of the five Central Pollution Control Board, Govt. of India, recognized / approved laboratories as given below –
a. Automotive Research Association of India, Pune (Maharashtra)
b. International Centre for Automotive Technology, Manesar (Haryana)
c. Indian Oil Corporation, Research and Development Centre, Faridabad (Haryana)
d. Indian Institute of Petroleum, Dehradun (Uttarakhand);
e. Vehicle Research Development Establishment, Ahmednagar (Maharashtra)
Or,

• Shift to gas based Generators by employing new gas based generators.

All establishments within the jurisdiction of Andhra Pradesh, which are operating DG sets of 125 kVA and above have to comply by the above mentioned directions by 5th March, 2021.

 

 

Source : Andhra Pradesh Pollution Control Board

Share this:

Sign up for our

Newsletter

You have successfully subscribed to the newsletter

There was an error while trying to send your request. Please try again.

Lexplosion will use the information you provide on this form to be in touch with you and to provide updates and marketing.